Industries · Government

Public sector modernization, delivered inside procurement reality.

Federal, state, and local. FedRAMP, StateRAMP, CMMC, CJIS. Accessibility built in, ATO timelines compressed by automation, vendor lock-out avoided by design.

FedRAMPStateRAMPCMMCSection 508
Government
Government & Public Sector

Authorization is not an afterthought — it is the architecture.

FedRAMP boundaries, CUI handling, and Section 508 are design inputs, not paperwork.

Public sector modernization fails when the authorization boundary, the procurement vehicle, and the engineering plan are designed in isolation. IntraStack delivers FedRAMP-aligned environments, CMMC 2.0 readiness, and DevSecOps adoption — with evidence pipelines instrumented from day one.

ATO acceleration

Continuous monitoring and control evidence automated — months of paperwork compressed to weeks.

CUI by design

Boundary, identity, and key management aligned to NIST 800-171 — not bolted on later.

Accessibility from CI

Section 508 and WCAG 2.1 AA gates fail the build, not the audit.

Cleared continuity

Cleared engineers, cleared documentation, runbooks the IG can read end to end.

Public services should be modernized at the speed of citizen need — not at the speed of the legacy SOW.

What's hard here.

Three challenges teams in public sector keep telling us about — and what we do about them.

A

Procurement gravity

Vehicles, schedules, set-asides. The contracting path shapes the architecture as much as the requirements do.

B

Authority to Operate

FedRAMP, ATO packages, continuous monitoring. Months of paperwork — unless it is automated.

C

Accessibility is law, not preference

Section 508 and WCAG 2.1 AA on day one. Retrofitting is the expensive path.

How we play it.

Our standard motion, tuned to the realities of public sector.

  1. 1

    Assess current estate

    Systems-of-record · authorization boundary · ATO status per system.

  2. 2

    Stand up landing zones

    FedRAMP-aligned environment · evidence pipeline · accessibility gates in CI.

  3. 3

    Migrate and modernize

    ATO scope reduced as work proceeds. Systems that do not earn their keep are retired.

  4. 4

    Operate as one team

    Cleared engineers · cleared documentation · runbooks the inspector general can read.

Reference architecture

Authorization boundary on the perimeter. Continuous monitoring threaded through. Public-facing services accessible by default.

edge · identity · data planeobserve · logs · metrics · cost
Related news

From the government desk.

What we are shipping, learning, and publishing for public sector clients.

Goes well with.

Services and solutions most commonly paired with Government engagements.

Bring the Government playbook to your team.

A 30-min call with someone who's done this before.